View Single Post
Old 09-18-2010, 04:25 PM   #15
Skipper_52
Getting Wild
 
Skipper_52's Avatar
E-Z-GO
 
Join Date: Aug 2010
Location: Illinois
Posts: 143
Default Re: EZGO Workhorse Project

Got the 6" Jake's lift kit and the steering back in. Bummer the motor mount holes are off for torque converter alignment. Going to have to weld a new motor mounting plate on top of theirs to kick the engine over 1/2". Don't have the room on the rear axle to shift it over. Existing belt is too small. Engine needs to move forward for clearance on the rear end shift arm and the oil filter. Belt size increased to 45" from the stock 41". Have to wait till the parts get here this week along with the tires and rims.
Attached Images
File Type: jpg 028.jpg (69.8 KB, 158 views)
File Type: jpg 029.jpg (110.8 KB, 167 views)
File Type: jpg 032.jpg (61.9 KB, 155 views)
File Type: jpg 033.jpg (97.4 KB, 172 views)
File Type: jpg 035.jpg (102.4 KB, 161 views)
Skipper_52 is offline   Reply With Quote