View Single Post
Old 03-12-2021, 05:24 PM   #1
Nolagt
Gone Wild
 
Join Date: Sep 2019
Posts: 154
Default CC onward with Navitas 5kw AC and 150ah 72v Lithium

Just pulled the trigger on a Navitas AC 5kw conversion kit with a solenoid and 2g wires along with a extreme team 72v 150ah lithium. The AC kit will come in before the battery so I will try ot get that hooked up before (not the 72v solenoid).

Any tips or tricks on installation of the motor and controller? I have not done that before. Does the body need to come off?

Going to be a long wait for that battery lol.
Nolagt is offline   Reply With Quote