Quote:
Originally Posted by five5cooks
Couple of images from todays adventure. New outer rails and supports welded on. I have to admit, this welding thing is a pretty cool trick. Used 2x2 angle welded the the frame for the supports and then 1x1 angle to run the length. I am assuming I got this done correctly since I was able to pick the cart up by the supports. I also welded an extra tab at the end to help secure the body once it is back on. I am thinking the TXT body will need some trimming to fit on the Marathon frame. My spring hangers are hitting on the back end where the well drops in-between the frame.
|
Looks great! Looking forward to seeing what it will take for the TXT to bolt up.